+49 9561 599 - 0 info@reichenbacher.de
Preview image of the article A perfect fit

Technical article: A perfect fit

Fast with first-class processing quality

Ammann staircase manufactory had bought one of our CNC-machining centres; but its route into the production facilities was barred by a storage building. How to resolve this situation? Seven hours later – a truck-mounted crane of 150 metric tons with 50 metric tons of ballast to provide a counterbalance, and the unit’s being lifted through the air for 22 metres – the machine had arrived in its future position.

This article was published in issue 7 of our customer magazine Insight.

Product(s)
Field(s) of application

Further technical articles on the product VISION-U-/L

Boundless source of creativity

Exclusive and aesthetically designed furniture
read more

Premium doors made by professionals

Quality and functionality as the top priority
read more

Stunning staircases

Innovation meets tradtion
read more

A perfect fit

Fast with first-class processing quality
read more

Further technical articles on the topic Stair construction

Stunning staircases

Innovation meets tradtion
read more

A perfect fit

Fast with first-class processing quality
read more

Staircases with a personal touch

Elegant simplicity or rustic charm
read more

Enjoy every step

Where craftsmanship meets innovation
read more
show all